McCLIM frozen. Again.
Two days ago, I announced the freeze of the current code base of mcclim. All in all, that doesn’t sound like it’s much different from the previous freeze (which failed), but this time:
- The freeze period is much shorter - projected release date is November 2nd;
- Both the test status as well as the release notes are on the mcclim cliki, and visible to all.
- I actually have the time and the energy to take care of these things.
I hope that this time, it will work out.
If you want to test mcclim before we release, feel free to report your results on IRC, on the test status page, or on the mcclim-devel mailing list.